Triples & Header Build on Big Angry

Looks like he's getting back at it. Hopefully can finish before school ties him down again.



Okay, so a few minor updates. I'm waiting on a pair of 3.5" ID Schedule 40 elbows to get here tomorrow so I can finish up the hot side.

I think this is where I left off with it last time....

If you look at that hot pipe, it's just an old BD piece that I had laying around that I made fit this setup. Well, I wasn't real happy with it as I had already adapted it to fit the S400 discharge when it was originally sized for an S300, so it was too small to begin with and it was cast iron which I had welded to mild steel....not terrible to do as long as you pre/post heat it but not ideal.

EAE7888F-A0A5-4912-BE48-6892135548E1_1.jpg


So, I'm making the hot pipe correctly with 3.5" ID coming off the secondary and splitting into the two 2.5" ID to feed the primaries. It'll all be Sch 40 carbon steel so no welding/cracking issues.

That means I had to make a new discharge flange for the secondary and new turbine flange into the bottom primary....

20160107_154116.jpg


20160108_150731.jpg


Love me some fire wrench....makes forming schedule 40 like folding cardboard.

20160108_145446.jpg


20160109_135404.jpg


And then I just laid out the oil lines and painted a few of the brackets to keep it from rusting up. Today I'm just going to make a few brackets to secure the oil lines and I'll pull the oil filter head off and drill and tap the feed holes for 1/4 NPT instead of the 1/8 NPT that is there now. I have to go bigger on the feed to support feeding 2 turbos with a -6 line and splitting into two -4's, so that necessitates opening up one of the ports on top of the filter head.


I also added a pair of gussets to the support bracket for that top primary (the one sitting farthest to the outside).

20160109_134650.jpg


Otherwise, today I'm just gonna make a set of brackets to hold oil lines in place and tomorrow I should have the elbows to do the hot pipe.
 
Little more for today





Did about as much as I could realistically do today. Cleaned up and drilled and tapped the filter head for the fittings I need....

20160110_111549.jpg


20160110_111636.jpg


20160110_123535.jpg


And finished laying out the oil lines, fittings, and brackets for them....

20160110_124410.jpg


20160110_124419.jpg


Once I get the elbows tomorrow I should be able to make a little real progress on the hot side. Some of this stuff IS stuff that I need to do but it really just a little busy work...
 
Continued .......





This is it for today.....

I still need to do the final fitment on for the hot pipe, I made it a little long so I could trim it to fit.

20160112_164633.jpg


20160112_170735.jpg


20160112_171640.jpg


20160112_172840.jpg


20160112_173352.jpg


And this is where I'm calling it a night....gotta get me crap together to head back to school. lol

20160112_174725.jpg
 
I'm not sure on that. I've never had the need for just a screen. We'll se how it works though.


I'm just wonder how air can be disrupted prior to the turbo taking it all in and spitting it out, to the point it was hurt power or something.
 
427 pages is nuts lol. Thats more than will terry's original thread on junker drag truck isn't it?

I was joking about that green pipe. I fully assumed he was going to finish it LOL
 
Back
Top