These are just the parts we had left to do the build. I assumed the connector tube bore was the same on cr and vp, just a longer tube for the cr. Thats hwat I get for assuming I guess. I could have a custom tube nut made to hold the cr tube in and also accept the vp fuel line. But It would probably be too expensive. If anyone has any ideas, let me know.