JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser .
1969 Ford Cummins Crew Conversion....
And on to some motor mount fabrication....
:rockwoot:
More from the passenger side motor mount...... I just trimed the stock brackets that bolt to the block to fit the bushing.
:rockwoot:
Some closer pics of the mount bracket.... stock 93 dodge stuff there!
:Cheer:
Getting with the drivers side mount.....
:Cheer:
More drivers side motor mount...
:Cheer:
New cross member shots.....
:rockwoot:
Welding up the mounts.....
:cheer:
And now I can cut off both sides of the frame rail forward of the new cross member....
:kick:
Trial fitting the new frame rail on the passenger side...
Progress continues on the frame rails. I have not cleared out the inside of the drivers side rail until I know where that power steering box is going to end up.
:rockwoot:
The work continues on the frame rails... back plating were the old and new come together.
The clearance on the top is for the power steering box....
:rockwoot:
More pics of the splice coming together....
:rockwoot:
Front cross member/spring hanger test fit...
:Cheer:
Finished welding up both sides of the frame splice and boxed in the joint....
:Cheer:
Same on drivers side....
:Cheer:
Test fitting the 78-79 power steering box....
:Cheer:
Thought about many different ways to skin this cat, but decided that I didn't want bolts sticking through the frame.... so here's the pics. Somehow I had taken more pics during fabrication of all this, but they didn't write to my card... Hmmmmm.
More pic's of the power steering box mount.
Fabing out the front cross member/ spring hanger.....
More pics of the crossmember......